A shipyard electrical upgrade, vessel-program change, or facility closure can leave distribution equipment with value beyond its remaining service at the site. We buy used, surplus, and decommissioned electrical equipment from shipyard projects, including switchgear, switchboards, motor control centers, panelboards, busway, automatic transfer switches, breakers, and unit substations. Share what is known about ownership, scope, and equipment condition; we review the details and make a cash offer when the equipment fits our buying needs.
Confirm who can authorize a sale
Shipyard assets can involve facility owners, tenants, vessel contractors, project firms, and equipment lessors. Before discussing a sale, identify the organization with authority to transfer the equipment and the person permitted to approve an offer. A project manager may know the scope without owning the gear; a property owner may control the asset even when another company operates it.
For example, equipment removed from a privately funded pier upgrade may belong to the shipyard, a tenant, or a contractor under the project agreement. A clear ownership path helps prevent delays after an offer is made. If title or approval is still being resolved, explain that early; do not represent another party’s equipment as available to sell.
Describe the project boundary
Define whether the opportunity comes from a single replacement lineup, a vessel-support building renovation, a dockside distribution change, or a broader site closure. Note which assemblies are included and which remain in service. A project drawing, equipment schedule, or written scope can help distinguish the sale group from adjacent gear without requiring anyone to inspect or alter equipment.
A practical example is a switchboard and associated breakers being replaced while a nearby motor control center remains operational. Identifying that boundary reduces confusion about what the offer covers. Known constraints—such as phased work, a scheduled shutdown, or access windows—are useful planning information, not a request for the seller to perform site work.
List assemblies and visible identifiers
Potential items include metal-enclosed switchgear, switchboards, motor control centers, panelboards, busway, automatic transfer switches, breakers, and unit substations. Describe quantities and assemblies as accurately as available records allow. A visible exterior nameplate may show manufacturer, type, serial information, voltage rating, or amp rating; voltage and amperage are different ratings and should not be used interchangeably.
Safe photographs of equipment exteriors and labels can help identify what is being considered. Take them only from a safe, accessible position; do not open doors, remove covers, operate controls, or approach equipment that may be energized. If labels are unreadable or records are incomplete, say so. You do not need to test equipment or produce a complete inventory to start a discussion.
Share records without creating site work
Useful existing documentation may include a prior equipment schedule, one-line diagram, removal scope, or a list prepared for the project. Share only records you are authorized to provide, and identify whether information is current, preliminary, or tied to a particular phase. A document can explain how a lineup was grouped or where a component belongs, but it does not establish condition beyond what it actually records.
Do not commission testing, open equipment, or arrange a separate inspection for our review. If documentation is unavailable, a concise description and safely accessible exterior photos may still help us evaluate the opportunity. Mention known damage, missing components, storage history, or uncertainty plainly. Disclose facts you already know; there is no requirement to investigate or perform additional seller labor.
Coordinate a safe handoff
For equipment we agree to buy, we handle and pay for crane, rigging, disconnection through qualified personnel, loading, freight, and hauling. The seller has no responsibility for that physical work and does not need to arrange, perform, or pay for disconnection, removal, rigging, loading, freight, hauling, or transportation. Timing and access can be discussed around the project’s established site rules and authorized contacts.
Electrical equipment may be energized or retain hazardous energy, even when described as surplus or out of service. Never open equipment, remove panels, operate controls, isolate it, or disconnect it to prepare for a sale. Those activities belong to qualified personnel. The seller does not test the equipment; the handoff plan is coordinated for accepted items with safety and site access in view.
Evaluate the offer and included scope
Offers depend on the equipment presented, its available identification and documentation, project timing, condition information already known, and the scope that can be acquired. We buy across all voltage classes, but a voltage rating alone does not determine whether an assembly is suitable for purchase. Not every item is accepted, and discussing a group does not mean every component in it will be included.
If we agree to buy, we make a cash offer and pay upfront under the agreed transaction terms. Clarify which assemblies and associated components are included, along with any known ownership or access conditions, before proceeding. A shipyard can consider the offer against its project schedule and asset authority without taking on testing or physical removal responsibilities for equipment we buy.