Industries
Healthcare modernization can leave distribution equipment surplus when a facility renovates a wing, consolidates electrical rooms, replaces aging infrastructure, or retires a building. If you own the removed or decommissioned equipment, we make cash offers for switchgear, switchboards, motor control centers, panelboards, busway, automatic transfer switches, breakers, and unit substations across voltage classes. Offers depend on the equipment and available details; not every item is accepted. For equipment we buy, we pay upfront and manage the physical handoff.
Confirm ownership before discussing removal
A healthcare project may involve equipment owned by a hospital, clinic, health system, property owner, or another party under a project agreement. Confirm who has authority to sell before requesting an offer. If ownership is shared, leased, or subject to a contractor or financing arrangement, resolve that internally first; the buyer needs a clear basis to purchase the surplus.
Project records can help establish the equipment’s status without requiring a new inventory effort. A decommissioning list, asset register, or existing electrical-room schedule may identify assemblies already designated for disposal. Share only information you can access safely and are authorized to provide. You do not need to create a new list, inspect equipment, or perform site work to start a conversation.
Identify assemblies from project records
Modernization surplus may include a switchboard replaced during a service upgrade, switchgear from a renovated electrical room, motor control centers serving retired mechanical systems, or panelboards removed during a floor refit. A data center or central plant within a healthcare campus may also have surplus busway, transfer switches, breakers, or a unit substation after a project changes its distribution arrangement.
Describe equipment using records you already have: assembly type, manufacturer name visible in documentation, approximate quantity, and any stated voltage and amp ratings. These are different ratings; do not treat one as a substitute for the other. A project drawing or schedule may clarify context, but do not open an enclosure, remove a cover, operate controls, or approach equipment to obtain details.
Coordinate around clinical operations
Healthcare projects often have phased work, restricted access, infection-control measures, and room-use constraints. If equipment is already scheduled for removal, note the relevant project phase or access window when discussing a potential purchase. This helps evaluate coordination, but it does not make the seller responsible for arranging removal or transport. Any site requirements should be addressed with the buyer before a handoff is planned.
For equipment we agree to buy, we handle and pay for the crane, rigging, disconnection through qualified personnel, loading, freight, and hauling. The seller has no responsibility for that physical work and does not need to arrange or pay for it. Do not disconnect, move, or prepare equipment yourself; electrical work and any required handling belong to qualified personnel coordinated for the project.
Share records and safe visual details
Existing documentation can support a more informed offer: equipment schedules, asset records, one-line drawings, nameplate transcriptions already on file, and project closeout documents are useful examples. Include the equipment’s known status, such as whether it is removed, decommissioned, or still installed, only when that information is confirmed. Missing records do not require you to test the equipment or create technical documentation.
If you choose to share photographs, use only exterior views taken from a safe, authorized location, such as a safely accessible photo of an exterior label. Do not open doors or panels, remove barriers, approach energized equipment, or enter a restricted electrical area for a picture. You may omit photographs entirely. We can consider the information available and explain what additional details, if any, would help assess the equipment.
Agree on scope and handoff
An offer applies to the equipment identified for consideration, not automatically to every assembly in a renovation or facility closure. For example, a buyer may evaluate listed switchgear and breakers separately from unrelated controls or damaged items. Acceptance depends on the equipment, its available details, and the proposed scope. Confirm which items are included before relying on an offer for project planning or disposition records.
When equipment is accepted, the buyer pays upfront and coordinates the physical handoff, including the crane, rigging, qualified-personnel disconnection, loading, freight, and hauling. The seller does not test the equipment and is not responsible for those tasks. Keep your own project and ownership records, and follow facility access and safety procedures; never energize, isolate, open, or disconnect equipment for the sale.

