Industries
A data center shutdown can leave substantial electrical equipment in place even after servers and IT assets have moved. If you own surplus or decommissioned distribution equipment, we buy switchgear, switchboards, motor control centers, panelboards, busway, automatic transfer switches, breakers and unit substations. Share what is known about ownership, equipment and project timing to help us assess it. We make cash offers and pay upfront for equipment we agree to buy; acceptance depends on the equipment, and not every item is accepted.
Confirm who can authorize a sale
Before discussing a specific shutdown, establish which entity owns the electrical assets and who is authorized to sell them. The data center operator, building owner, equipment lessor and project contractor may have different interests. A purchase can proceed only when the seller has authority to transfer the items and can identify any ownership restrictions or required internal approvals.
For example, a property owner may retain installed switchgear while a tenant owns certain modular distribution equipment. A decommissioning schedule, lease closeout records or asset register may help clarify the distinction. You do not need to compile a perfect inventory or perform site work before speaking with us; simply share known ownership details and any uncertainties that could affect a sale.
Describe the distribution assemblies
A project may include main or secondary switchgear, switchboards, motor control centers, panelboards, busway, automatic transfer switches, circuit breakers or unit substations. The configuration matters: identify assemblies as best you can, and distinguish complete lineups from individual sections, spare breakers or removed components. Examples are useful, but a category name alone does not guarantee that an item is suitable for purchase.
If readily available, exterior nameplate information can help describe manufacturer, type, voltage rating and amp rating. Voltage and amperage are different ratings; report each as labeled rather than treating one as a substitute for the other. Do not open enclosures, remove covers, operate controls or test equipment to gather details. A safely accessible exterior label or photograph is enough to support an initial review.
Coordinate around shutdown milestones
A data center project may have phased de-energization, tenant departures, equipment reuse and building turnover dates. A simple sequence—what remains, when access may be available and when the space must be cleared—helps evaluate whether a purchase can fit the project. It is also useful to flag planned construction, access limits or other known site constraints without attempting to resolve them yourself.
We coordinate the physical work for equipment we buy. We handle and pay for the crane, rigging, disconnection through qualified personnel, loading, freight and hauling. The seller does not need to arrange, perform or pay for those tasks, whether the equipment is in an electrical room, loading area or another site location. Any work involving energized equipment or hazardous energy is for qualified personnel, not the seller.
Share records you already have
Existing records can make an equipment review more precise without turning the sale into an audit. Useful examples include asset schedules, purchase or ownership records, one-line diagrams already on file, equipment lists, and notes identifying which assemblies are intended to remain. Share only material you are authorized to disclose, and distinguish verified information from estimates or details that still need confirmation.
A concise list can group items by building, electrical room or lineup and note known quantities and condition observations. Safely accessible photographs of exterior labels or equipment can also help; do not remove guards or panels to improve a photo. You are not expected to test the equipment, create technical records, or certify its condition. Unknown details can be identified as unknown.
Plan a safe handoff and decision
Keep access to electrical equipment controlled throughout the project. Do not open equipment, remove panels, operate breakers, isolate circuits or attempt disconnection for an assessment or handoff. Equipment may be energized or retain hazardous energy. If a purchase is agreed, qualified personnel handle disconnection as part of the buyer-managed physical work; the seller can focus on authorization, coordination and any relevant records.
Offers depend on the equipment reviewed, including what is available and its reported configuration and condition; purchase of every listed item is not guaranteed. We make cash offers and pay upfront for equipment we agree to buy. Before proceeding, confirm the included items, site access coordination and agreed logistics. The seller does not test the equipment and has no responsibility for the rigging, disconnection, loading, freight or hauling arranged and paid for by us.

