Seller Guides
A canceled project can leave switchgear that is new, surplus, partially installed, or held in storage with its intended use gone. Selling it may recover value and clear space, but an offer depends on what the equipment is, its condition, and the details available. This guide explains what to gather, how to consider timing and site constraints, and what happens if we agree to buy equipment—without requiring you to test it or handle its removal.
Start with the project record
Use purchase orders, invoices, approved submittals, packing lists, and change notices to establish what was procured and whether the order was completed. These records can distinguish a complete assembly from a group of separately purchased components, and may clarify whether equipment is still with the supplier or already at your site.
Note the original application only as context: for example, a planned building expansion, process upgrade, or power project that was canceled. Do not assume that an item will suit another installation simply because it was selected for a particular design. A buyer evaluates the equipment being offered, not the canceled project’s intended design.
Identify equipment from safe information
Record visible exterior nameplate details and labels that can be read safely, such as equipment type, manufacturer, catalog or serial identifiers, and stated voltage and amp ratings. These are different ratings: voltage describes electrical potential, while amperage describes current capacity. Do not infer either rating from cabinet size, appearance, or a neighboring component.
Useful categories include switchgear, switchboards, motor control centers, panelboards, busway, automatic transfer switches, breakers, and unit substations. If the canceled project included several categories, list them separately rather than describing everything as “switchgear.” The buyer can then assess the actual items and ask focused questions about any unclear description.
Share only what is safely accessible
A short written inventory and photographs of exterior labels or safely accessible equipment views can help support an offer. Share images only from locations you can access without opening equipment, removing panels, approaching exposed electrical hazards, or interrupting site operations. If a label cannot be viewed safely, state that it is unavailable rather than trying to get a closer look.
Do not energize equipment, operate controls, open enclosures, or test breakers to improve the description. Equipment may be energized or retain hazardous energy even when a project has stopped. Any electrical assessment, isolation, or disconnection is work for qualified personnel; the seller does not need to perform testing for us to consider the equipment.
Decide whether to offer the full lot
Group items by type, location, and apparent completeness. For example, separate a documented lineup from loose breakers, unused busway sections, or items whose project status is uncertain. This makes it easier to explain what is available without claiming that every component is complete, compatible, or suitable for a future installation.
Consider whether one offer for the available lot is more practical than sorting items for separate disposition. You can identify items you prefer to retain or exclude, but acceptance is not guaranteed for every item. Offers depend on the equipment and information available; we may offer on some items and not others, or be unable to make an offer.
Account for storage and project timing
Check where the equipment is held, whether it is indoors or outdoors, and whether access is controlled or time-limited. Note known storage conditions, packaging status, visible damage, and whether the material has been moved or handled since procurement. Report observations plainly; do not remove packaging or reposition equipment just to create a better view.
Compare any holding costs or release deadlines with the time available to consider an offer. A supplier or landlord may control access or ownership documents, so confirm who is authorized to discuss a sale. Sharing those constraints early helps establish whether a potential purchase and pickup can be considered within the site’s permitted window.
Understand pickup responsibilities
For equipment we buy, we handle and pay for the crane, rigging, disconnection through qualified personnel, loading, freight, and hauling. The seller has no responsibility to arrange, perform, or pay for that physical work. You do not need to line up a separate contractor or prepare the equipment for removal as a condition of discussing a sale.
Site access, safety rules, operating hours, and any required approvals still need to be understood so the pickup can be coordinated appropriately. Do not disconnect equipment or direct unqualified staff to move it. If access requires advance notice or a site-specific process, describe that requirement; our qualified personnel handle disconnection as part of the work for equipment we agree to buy.
Review the offer and next steps
When considering an offer, compare its scope with the items you described and check any stated conditions before accepting. A cash offer is not a promise to purchase every item in a canceled-project lot. We pay upfront for equipment we agree to buy, and the pickup arrangements for those items are handled and paid for by us.
If you want to proceed, confirm that you have authority to sell the equipment and share any known ownership, release, or access constraints. Do not arrange removal or incur preparation costs on the assumption that an offer will be made. If the equipment is not accepted, it remains outside the agreed purchase, and you can decide separately how to handle it.