Industries
A laboratory renovation, consolidation or shutdown can leave electrical distribution equipment that no longer fits the facility’s plans. We buy used, surplus and decommissioned switchgear, switchboards, motor control centers, panelboards, busway, automatic transfer switches, breakers and unit substations, including equipment from laboratory projects. We make cash offers and pay upfront for equipment we agree to buy. Offers depend on the equipment and project details; not every item is accepted.
Confirm ownership before discussing equipment
Laboratory electrical assets may belong to a university, research company, landlord, facilities operator or equipment-financing party. Before seeking an offer, identify who has authority to sell each assembly. A shutdown contractor’s possession of equipment does not necessarily establish ownership, and a tenant may not own distribution gear installed as part of the building.
For a shared electrical room, a simple equipment list can help distinguish facility-owned gear from tenant improvements or separately funded project assets. Note any known ownership restrictions, pending transfers or decommissioning approvals. You do not need to complete an inventory or perform site work for us; clarify what is known and we can discuss the opportunity based on available information.
Identify assemblies in the project scope
A laboratory upgrade might make a switchboard, feeder breakers, a motor control center, panelboards, busway sections or an automatic transfer switch available. A research building closure could also include switchgear or a unit substation. These are examples, not a promise that a particular assembly or configuration will be accepted. We buy across voltage classes, but a voltage rating is distinct from an amp rating.
When readily available, visible exterior nameplate information can help identify the manufacturer, equipment type, voltage rating, amp rating and other stated details. You may share safely accessible photos of labels and closed equipment exteriors. Do not open enclosures, remove covers, operate controls or approach equipment to obtain information; equipment may be energized or retain hazardous energy.
Coordinate around laboratory project phases
In a phased laboratory renovation, electrical equipment may be designated for retention, reuse, contractor use or removal at different points in the schedule. Separating these categories on a project list can prevent confusion about what is actually offered. If work is still being planned, indicate which assemblies are confirmed surplus and which remain subject to design, ownership or facilities decisions.
We can coordinate with the seller’s authorized project contact about equipment we agree to buy and the practical handoff. The seller does not have to arrange or perform disconnection, removal, rigging, loading, freight or hauling. Those activities are handled by us for purchased equipment, with disconnection performed through qualified personnel. Do not treat this coordination as permission to disturb operating equipment.
Share documentation that is already available
Existing records can clarify an assembly’s identity and project status without asking laboratory staff to create a new technical package. Useful material may include an asset register entry, a decommissioning list, an equipment schedule or visible label details. A note that a record is incomplete or that a rating is unknown is more useful than guessing or substituting information from nearby equipment.
Do not test equipment for a sale, and do not ask facility staff to energize, isolate or inspect internal components to answer questions. We do not require seller testing. If documents or safe exterior photographs are unavailable, you can still describe what is known, such as the general equipment type, where it is assigned in the project records and whether ownership is clear.
Plan a safe, straightforward handoff
For equipment we buy, we handle and pay for the crane, rigging, disconnection through qualified personnel, loading, freight and hauling. The seller has no responsibility for arranging, performing or paying for that physical work, and can simply receive payment without testing the equipment. Site access and timing can be discussed with the authorized contact so the handoff fits the facility’s project constraints.
An offer is based on the equipment and information available; an offer does not mean every listed item will be accepted. A clear description of the candidate assemblies, known ownership and any safely available documentation helps establish what is being considered. Do not open equipment or attempt a disconnection for photographs or transfer. Leave electrical work and hazardous-energy controls to qualified personnel.

