A cold storage project can leave substantial electrical equipment surplus when a facility is decommissioned, a refrigeration system is replaced, or distribution is reconfigured. If you own the equipment and are authorized to sell it, we can review switchgear, switchboards, motor control centers, panelboards, busway, automatic transfer switches, breakers and unit substations. We make cash offers and pay upfront for equipment we agree to buy; offers depend on the equipment, and not every item is accepted.
Start with ownership and project scope
Before discussing equipment, confirm who owns it and who can authorize a sale. In a leased cold storage building, the property owner, operator, refrigeration contractor and lender may have different interests. A clear internal approval path helps avoid delays after an offer. You do not need to complete a site inventory or perform project work to begin a conversation.
Define the surplus scope around the actual project: a full facility closure, a phased refrigeration replacement, or a distribution upgrade serving new compressors and cold rooms. For example, a project may retire one electrical room while keeping panels that serve active areas. Identify what is intended to be sold and what must remain, without touching energized equipment or disrupting operations.
Identify assemblies by function
Cold storage distribution may include service or feeder switchgear, switchboards, motor control centers serving refrigeration loads, panelboards, busway, automatic transfer switches, breakers and unit substations. Depending on the project, an assembly may be removed from service as part of a larger replacement or remain installed while other equipment is retained. These are examples of equipment categories, not a promise that any particular assembly will be purchased.
When readily available, exterior nameplate details can help distinguish equipment: manufacturer, type or catalog designation, voltage rating, amp rating, and any legible date or serial information. Voltage and amperage describe different ratings; one should not be substituted for the other. Do not open doors, remove covers, operate controls or approach equipment to obtain details. Share only information already known or safely accessible.
Coordinate around a live facility
A cold storage site may have active refrigeration, temperature-controlled inventory, shift schedules and restricted access. If surplus equipment is still installed near operating areas, explain known access windows, site rules and any project milestones. This context can help us assess coordination needs without asking you to plan the physical removal. Keep operational decisions with the facility’s authorized personnel and qualified electrical professionals.
For equipment we buy, we handle and pay for the crane, rigging, disconnection through qualified personnel, loading, freight and hauling. The seller has no responsibility to arrange, perform or pay for that physical work. You do not need to hire a contractor, provide a crane, disconnect equipment or prepare it for transport as a condition of discussing a sale.
Share records without extra work
Useful existing records might include an equipment schedule, one-line diagram, project demolition list, prior asset register or the contractor’s scope identifying assemblies slated for replacement. Sharing known details can clarify which equipment is included and whether a listed component is part of a larger assembly. No new documentation package is required, and you need not create an inventory, verify ratings or conduct testing for us.
Safe photographs can also support a review when they are already available or can be taken from a safe, permitted position. Exterior labels and overall views are useful; avoid removing barriers, opening equipment, or entering restricted electrical areas to get a better image. Do not test equipment or ask staff to operate it for a photo. If details are unavailable, say so rather than guessing.
Agree on scope and safe handoff
A practical sale discussion separates the equipment under review from retained assets, building infrastructure and items owned by another party. For instance, a retired motor control center may be in scope while a nearby panel remains essential to active refrigeration. Confirm the intended boundaries using existing project information and authorized contacts; an offer is based on the equipment reviewed, not an assumption that every item in the room is included.
Equipment may be energized or retain hazardous energy, so leave inspection, isolation, disconnection and removal to qualified personnel. The seller does not test the equipment and can simply receive payment for equipment we agree to buy. We coordinate and pay for the physical work and transportation for those purchases. Any offer remains specific to the equipment; acceptance of every listed item is not guaranteed.