Locations
If you have surplus or decommissioned busway in or around Columbia, South Carolina, we make cash offers to buy equipment that fits our purchasing needs. Busway sections, fittings and related components can differ in type, rating, configuration and condition, so a useful review starts with what is known—not assumptions about age or appearance. Share available documentation or safely accessible exterior photos if convenient; you do not need to test, disconnect or prepare equipment for removal.
Identify what is on hand
Busway is a modular electrical distribution system made up of enclosed conductors and connected sections. An inventory may include straight lengths, elbows, tees, end pieces, tap-off units and other fittings. Note which pieces appear to belong together and whether labels identify a manufacturer or product family. Keep observations to visible markings; do not open enclosures or remove covers to identify internal construction.
Record known voltage and amp ratings as separate details: voltage describes the system’s electrical rating, while amperage describes current capacity. A clear label photo may help distinguish them. Do not infer either rating from dimensions, color, building use or nearby equipment. If labels are missing, report that uncertainty rather than guessing; an offer can be considered using the information available.
Make documentation useful
Useful records can include purchase or asset lists, drawings, packing records, prior decommissioning notes and photographs already on hand. A simple count by section type and approximate length is often more practical than a polished inventory. Note whether tap-off units or fittings are included, but do not represent unverified items as compatible with a particular run or system.
Photos are optional and should be taken only from a safe, accessible position, showing exterior labels and the stored equipment without opening it. Avoid entering restricted areas or moving material to improve a picture. If you have no records or cannot safely reach a label, say so. Missing documentation does not require you to perform site work or testing before asking about a sale.
Describe condition without testing
For an initial description, report visible exterior condition: for example, bent housing, dented sections, corrosion, water staining, missing end pieces or damaged packaging. Separate what you observed from what you know; a storage note is not proof of electrical condition. Do not energize, operate, dismantle or test busway, and do not remove panels to check conductors or connections.
Explain whether pieces are loose, palletized, still installed, or mixed with unrelated material, and flag any known handling restrictions. Busway may be energized or retain hazardous energy even when it appears inactive. Keep clear of equipment that may be live or otherwise unsafe, and leave electrical assessment and any required disconnection to qualified personnel. No seller test report is required for the seller to get paid for equipment we buy.
Consider a storage cleanout
Imagine a seller clearing a warehouse where busway has been in storage for some time. Some lengths may be grouped on pallets, while fittings sit in labeled boxes and a narrow aisle limits access for lifting equipment. A helpful description could state the approximate number of grouped sections, visible labels, which cartons appear associated, and the aisle constraint—without asking staff to rearrange or handle the material.
That information helps frame practical questions about access and loading, but it does not commit us to buying every piece. Offers depend on the equipment and the details available; acceptance of one group does not guarantee acceptance of another. The same approach works for installed or stored equipment elsewhere: describe what is visible, identify access limits, and leave any physical preparation to the buyer if equipment is accepted.
Clarify removal and freight
For equipment we buy, we handle and pay for the crane, rigging, disconnection through qualified personnel, loading, freight and hauling. The seller does not arrange, perform or pay for that physical work, and has no responsibility for those tasks. Do not hire a separate contractor or attempt to prepare the busway for pickup on our behalf; any necessary work must be planned by us with qualified personnel.
Before proceeding, discuss site access facts such as doorway dimensions if already known, overhead or aisle restrictions, loading-area availability and any site rules or scheduling windows. Sharing existing information is optional and does not make seller labor a prerequisite. Do not measure in unsafe areas, move stored equipment or operate site systems to facilitate a review. We can assess logistics in relation to equipment we agree to buy.
Review the offer and handoff
We make cash offers and pay upfront for equipment we agree to buy. The offer depends on the busway presented and the information available; not every item is accepted, and an inquiry is not a promise of purchase or a specific amount. Before accepting, confirm which identified equipment is included, the agreed payment arrangement and the planned buyer-managed removal and transportation responsibilities.
At handoff, keep the scope clear: distinguish included busway from adjacent electrical equipment, building materials or unrelated stored goods. Do not label, disconnect or move anything if doing so would require unsafe access or site work. If ownership records or access approvals are relevant to your situation, have the appropriate information available, but do not delay a discussion to create a new inventory or perform physical work.

