Equipment
Have surplus busway in South Carolina after a facility change, equipment upgrade, data center decommissioning, or plant shutdown? We buy used, surplus, and decommissioned busway and make cash offers based on the equipment and information available. You do not need electrical expertise to start: a few clear photographs of safely accessible exterior labels and a plain description of what you know can help us review it.
Start with what you can see
Busway can be difficult to describe if you have never worked with it. Begin with ordinary observations: where it was used, whether it is stored or still installed, and approximately how many straight sections or other pieces appear to be present. It is fine to say “not sure” when a detail is unknown; do not guess at electrical specifications.
If safe, photograph the outside of the busway and any visible labels that can be reached without opening equipment or approaching a hazard. A readable nameplate may show useful identifying information. Keep the camera outside the equipment, and do not remove covers, touch conductors, or move components to improve a picture.
Photograph labels, not hidden parts
A useful photo set can include a wide view showing the general quantity and arrangement, plus close-ups of exterior labels and visible condition. Include a ruler or familiar object only if it can be placed safely without touching or disturbing the equipment. Take pictures from a stable, permitted location and follow site rules.
Photos are optional supporting information, not a technical inspection. Do not open a busway enclosure, remove a panel, operate controls, or try to expose internal parts. Equipment may be energized or retain hazardous energy. If safe photography is not possible, skip it; a verbal description or existing records can still help begin a review.
Use everyday terms for condition
You can describe visible condition in simple language: clean, dusty, scratched, dented, or showing signs of water exposure. Mention whether sections appear complete or whether you already know that pieces are missing. Avoid calling busway functional, tested, or electrically sound unless that status comes from reliable records you already have.
Useful context includes whether the busway was recently removed, has been in storage, or came from a decommissioned data center or shut-down power plant. If you know when it was taken out of service, say so; if you do not, that is not a reason to arrange testing. The seller does not test the equipment.
Share known details without guessing
Visible labels and existing paperwork may identify a manufacturer, series, voltage rating, amp rating, or other markings. Share only what you can read or already know, and keep voltage and amp ratings distinct: they describe different characteristics. A blurry label or missing record is better reported as unclear than interpreted from appearance.
If you have an inventory, packing list, or old project document already available, it can help describe the lot, but you do not need to create one. A simple count of visibly identifiable sections is useful when convenient. Do not climb, reach into restricted areas, or handle busway to gather information; qualified site personnel must manage any physical work.
Offers depend on the equipment
We review busway based on the details available, its apparent condition, quantity, and the circumstances of the equipment. We buy across voltage classes, but that does not mean every item or lot will be accepted. An offer is specific to the equipment under review; sharing clear photos or known details can support that decision but cannot guarantee an offer.
If we agree to buy equipment, we make a cash offer and pay upfront. The amount depends on the equipment, so no particular price should be assumed before review. If a lot includes busway alongside other electrical equipment, describe the items separately when practical. That helps clarify what is being considered without requiring a formal technical inventory.
We handle the physical work
For equipment we buy, we handle and pay for the crane, rigging, disconnection through qualified personnel, loading, freight, and hauling. You do not need to arrange, perform, or pay for any of that physical work, and there is no seller testing requirement. You can provide the information you already have and, if accepted, get paid without taking on removal logistics.
Busway may be energized or retain hazardous energy, so do not attempt to isolate, disconnect, dismantle, or move it. Those tasks belong to qualified personnel. No seller or separate contractor needs to be hired by you to disconnect, remove, rig, load, ship, or haul equipment we agree to buy; our responsibility for that work applies to accepted equipment.

