Equipment
Have a secondary unit substation left over after a facility change, shutdown or equipment upgrade? Before requesting a cash offer, it helps to know what information can clarify its configuration, what condition details matter, and what happens if we agree to buy it. We buy used, surplus and decommissioned secondary unit substations in South Carolina. Offers depend on the equipment and available details; not every unit or component is accepted.
What is included in the unit?
A secondary unit substation may include a transformer and associated switchgear or other connected sections. Describe what you understand to be part of the equipment and whether any sections are known to be separate, missing or already removed. An exterior photo showing the overall assembly can help distinguish a complete unit from a partial lineup without requiring you to inspect inside.
If the equipment is identified by separate nameplates or labels, share only information that is visible from a safe position. A label on the transformer may differ from one on a switchgear section, so note which component each detail belongs to. Do not open doors or remove covers to find specifications; details you do not know can simply remain unknown.
Which ratings and labels help?
Visible nameplate information can help us understand what is being offered. Useful details may include the equipment’s stated voltage rating, transformer kVA rating, and switchgear or protective-device amp rating, when these are legible. Voltage and amperage describe different electrical characteristics; do not treat an amp rating as a voltage rating or infer one from the other.
You can type the wording you can safely read or provide a clear exterior photo of an accessible label. Include the manufacturer name only as equipment identification, not as a claim of affiliation. If a label is faded, obscured, or inaccessible without opening equipment, say so rather than guessing or attempting to reach it.
What condition should you report?
Give a practical account of known condition: for example, whether the exterior appears intact, whether a section is visibly damaged, or whether components are known to be missing. Distinguish what you have directly observed from old records or someone else’s account. This helps frame the offer without turning the request into an inspection or asking you to establish technical condition.
Do not test the substation, operate controls, remove panels, or investigate internal parts. Electrical equipment can remain energized or retain hazardous energy even when its status is uncertain. If you already know of a history such as water exposure or a shutdown, share that information if convenient; no one should approach or handle the equipment to confirm it for the offer.
What site details are useful?
A few general site facts can help us consider the practical purchase: whether the substation is indoors or outdoors, whether its location is known, and whether there is an obvious access constraint such as a narrow route or limited overhead clearance. Safe, existing photographs of the exterior and surrounding access may help explain these conditions; do not enter restricted areas or move anything to take pictures.
You do not need to prepare an inventory, measure the equipment, arrange a site visit, or perform site work before asking about an offer. Share only details already available to you. If access conditions are uncertain, say so. We can consider that information as part of evaluating the equipment and how an agreed purchase could be handled.
Who handles removal and payment?
For equipment we agree to buy, we handle and pay for the crane, rigging, disconnection through qualified personnel, loading, freight and hauling. The seller has no responsibility to arrange, perform or pay for that physical work, including transportation. You do not need to hire a separate contractor for removal or prepare the substation for pickup; any disconnection is handled by qualified personnel.
We make cash offers and pay upfront for equipment we buy. The offer depends on the particular substation and the details available, and acceptance is not guaranteed for every item. You are not expected to test the equipment or complete physical work to get paid. If a proposed transaction moves forward, the purchase and pickup arrangements can be discussed for the specific equipment and site.

